To see the planning board meeting packet, click here.
Pedestrian Bridge Site Preparation – Anticipated Noise
Recent Posts
Brockport Cemetery Historic Ghostwalk 10/23/2026
Brockport Cemetery Historic Ghostwalk – October 23, 2026
BROCKPORT – The Brockport Museum & Library of Local History will be hosting its first annual Brockport Cemetery Historic Ghostwalk on High Street in the village on October 23, 2026, beginning at 6:30 PM weather permitting. The ghost walk will feature the stories...
Village Board Meeting 10/05/2026
The agenda and packet for the 10/05/2026 Village Board meeting can be found here: https://ecode360.com/BR0227/document/753290936.pdf
2026-09-28 Agenda for Village Board Workshop
You can view the 9-28-26 Workshop Agenda here
TRAFFIC ALERT – Smith St. Bridge will be temporarily closed
Monday, the Smith St. Bridge will be temporarily closed to all traffic. Please plan ahead, use alternate routes, and allow extra travel time for your commute. Updates will be posted as soon as the bridge re-opens. If you have any questions, please call the Village...
Starting next week the Canal Corporation will be doing earth work including clearing and grubbing on the north end of the canal to prepare the site of the pedestrian bridge abutment. Residents in the area* may hear some noise but should not see anything from their homes. The trail in that area will remain open and signage will inform users of work in the area and steer them clear. This work is strictly related and essential to the pedestrian bridge project and is not part of the Earthen Embankment Integrity Program. This work will last approximately 2-3 weeks.
*Please note the pedestrian bridge area is located in the western section of the Village, between Holley St./and SUNY’s Commissary Park, across the Canal, to the west end of Evergreen Rd. and Willowbrooke Drive.
