Scheduled Repair/ Park Ave Lift Bridge

Recent Posts

🍂 Fall Leaf Pickup Notice 🍂

Fall leaf collection is underway! Please take note of the following guidelines: Schedule: Collection runs through December 11th (or until the first major snowfall). Placement: Place leaves at the curb, not in the street or road. If Using Bags: Only biodegradable paper...

Village Board Meeting 10/19/2026

The agenda and packet for the Village Board Meeting of 10/19/2026 can be seen here https://ecode360.com/BR0227/document/753296999.pdf

Village Office closed

BROCKPORT VILLAGE HALL is closed Monday, October 12, 2026 In Honor of Indigenous Peoples’ Day   Feel free to place correspondence or payments in the locked drop box at drive entrance. Thank you.

NYSDOT will be replacing the Park/Fayette lift bridge floor system. Work on this structure is tentatively scheduled to begin on Tuesday December 8, 2020 with the bridge being closed to traffic. There will not be a posted detour for this work, only bridge closure signs and barricades. Work is currently scheduled to take approximately 4 months to complete.