Comments from Mayor Blackman: opt out solar and opt out electric

Recent Posts

🍂 Fall Leaf Pickup Notice 🍂

Fall leaf collection is underway! Please take note of the following guidelines: Schedule: Collection runs through December 11th (or until the first major snowfall). Placement: Place leaves at the curb, not in the street or road. If Using Bags: Only biodegradable paper...

Village Board Meeting 10/19/2026

The agenda and packet for the Village Board Meeting of 10/19/2026 can be seen here https://ecode360.com/BR0227/document/753296999.pdf

Village Office closed

BROCKPORT VILLAGE HALL is closed Monday, October 12, 2026 In Honor of Indigenous Peoples’ Day   Feel free to place correspondence or payments in the locked drop box at drive entrance. Thank you.

On July 28 I sat in as a panelist on the Joule/Finger Lakes CCA public meeting which reviewed the opt out solar and opt out electric. There has been, as we all know, a lot of confusion about the latter.

For comparison to the rates it offers through Constellation for renewable (the default) and for the standard fixed rate, the letter gives the average National Grid supply rate from April of 2020 to March of 2021. At that time rates were low, greatly impacted by the pandemic. National Grid’s supply rates went up substantially after March of 2021. The current National Grid supply rate for residences is .05516. So compare that rate with the 2 year fixed rate Constellation offers—.05912 (all renewable energy) or .04960 (standard fixed rate). We cannot know what the future holds for the variable NG rate but we know for certain what the village program offers. You will be automatically opted in to the renewable, but you can opt out of that and choose the standard fixed rate, or opt out and stay with the National Grid rate.

To opt out of the default renewable and to stay with National Grid, fill out the card that came with the letter sent to you from the Village, or call the Finger Lakes Community Choice program hotline (585) 244-0244 by August 14th. To opt-down from the default renewable to the fixed standard rate, please call the program hotline for assistance at (585) 244-0244.

Margay Blackman, Mayor
Village of Brockport