Fall leaf collection is underway! Please take note of the following guidelines: Schedule: Collection runs through December 11th (or until the first major snowfall). Placement: Place leaves at the curb, not in the street or road. If Using Bags: Only biodegradable paper...
Comments from Mayor Blackman: opt out solar and opt out electric
Recent Posts
Village Board 11/02/2026 DRAFT agenda and packet
To view the DRAFT agenda and packet for the 11/02/2026 Village Board meeting, follow this link:Â Â https://ecode360.com/BR0227/document/753297364.pdf
10/26/2026 DRAFT Village Board Workshop
To view the DRAFT agenda for the 10/26/2026 Village Board Workshop, follow this link:Â https://ecode360.com/BR0227/document/753297271.pdf
Village Board Meeting 10/19/2026
The agenda and packet for the Village Board Meeting of 10/19/2026 can be seen here https://ecode360.com/BR0227/document/753296999.pdf
Village Office closed
BROCKPORT VILLAGE HALL is closed Monday, October 12, 2026 In Honor of Indigenous Peoples’ Day  Feel free to place correspondence or payments in the locked drop box at drive entrance. Thank you.
Hydrant Flushing – October 6th – 8th 2026
To see the full notice click here: Fall Flushing Notice October 2026
On July 28 I sat in as a panelist on the Joule/Finger Lakes CCA public meeting which reviewed the opt out solar and opt out electric. There has been, as we all know, a lot of confusion about the latter.
For comparison to the rates it offers through Constellation for renewable (the default) and for the standard fixed rate, the letter gives the average National Grid supply rate from April of 2020 to March of 2021. At that time rates were low, greatly impacted by the pandemic. National Grid’s supply rates went up substantially after March of 2021. The current National Grid supply rate for residences is .05516. So compare that rate with the 2 year fixed rate Constellation offers—.05912 (all renewable energy) or .04960 (standard fixed rate). We cannot know what the future holds for the variable NG rate but we know for certain what the village program offers. You will be automatically opted in to the renewable, but you can opt out of that and choose the standard fixed rate, or opt out and stay with the National Grid rate.
To opt out of the default renewable and to stay with National Grid, fill out the card that came with the letter sent to you from the Village, or call the Finger Lakes Community Choice program hotline (585) 244-0244 by August 14th. To opt-down from the default renewable to the fixed standard rate, please call the program hotline for assistance at (585) 244-0244.
Margay Blackman, Mayor
Village of Brockport
