CHASE BANK PARKING LOT CONSTRUCTION

Recent Posts

🍂 Fall Leaf Pickup Notice 🍂

Fall leaf collection is underway! Please take note of the following guidelines: Schedule: Collection runs through December 11th (or until the first major snowfall). Placement: Place leaves at the curb, not in the street or road. If Using Bags: Only biodegradable paper...

Village Board Meeting 10/19/2026

The agenda and packet for the Village Board Meeting of 10/19/2026 can be seen here https://ecode360.com/BR0227/document/753296999.pdf

Village Office closed

BROCKPORT VILLAGE HALL is closed Monday, October 12, 2026 In Honor of Indigenous Peoples’ Day   Feel free to place correspondence or payments in the locked drop box at drive entrance. Thank you.

The Department of Public Works will be pouring concrete curbs, Tuesday, April 11th and replacing concrete sidewalks on both sides of the parking lot on Thursday, April 13th. Milling is scheduled for Wednesday, May 3rd and paving will take place early to mid May (weather permitting).
Please note there will be only one open entrance on each side of the lot with barricades marking the open lot path inside the lot.
Queen St and Lincoln St will be open as normal.
If you have any questions, please call the DPW at 637-1060.