Fall leaf collection is underway! Please take note of the following guidelines: Schedule: Collection runs through December 11th (or until the first major snowfall). Placement: Place bagged leaves at the curb, not in the street or road. Bags: Only biodegradable paper...
Removing the Main Street Bridge Trusses (by Mayor Blackman)
Recent Posts
Village Board 11/02/2026 DRAFT agenda and packet
To view the DRAFT agenda and packet for the 11/02/2026 Village Board meeting, follow this link: https://ecode360.com/BR0227/document/753297364.pdf
10/26/2026 DRAFT Village Board Workshop
To view the DRAFT agenda for the 10/26/2026 Village Board Workshop, follow this link: https://ecode360.com/BR0227/document/753297271.pdf
Village Board Meeting 10/19/2026
The agenda and packet for the Village Board Meeting of 10/19/2026 can be seen here https://ecode360.com/BR0227/document/753296999.pdf
Village Office closed
BROCKPORT VILLAGE HALL is closed Monday, October 12, 2026 In Honor of Indigenous Peoples’ Day Feel free to place correspondence or payments in the locked drop box at drive entrance. Thank you.
Hydrant Flushing – October 6th – 8th 2026
To see the full notice click here: Fall Flushing Notice October 2026

Is on schedule for tomorrow, August 2nd. The assembly of the 600 ton crane that will do the job is being completed today. First thing tomorrow, the floor beam in the middle of the bridge will be removed (see photo), then the west truss will be attached by cables to a spreader beam, in turn, attached by the same cables to the crane. The truss will be cut with a torch above the floor beams at each end of the bridge, then lifted over the canal and Main Street trailhead to the cleared property at 7 North Main where it will be lowered onto temporary truss supports. The west truss will be moved between 9am and 11am, the east truss between noon and 2 pm.
All navigation on the canal, per the canal corp, will be restricted between 8:20 and 2pm Wednesday. Boats will be held at the Park Avenue bridge going west, and at the Holley lift bridge, going east. Flaggers will be present on the canal and on the canal path for pedestrians when the trusses are being swung over.
The trusses each weigh 87,115 lbs; including the spreader beam and its rigging, the total weight is 96,413 lbs. A 5% safety factor is figured in to bring the total weight with safety factor to 101,600 lbs.
