Bridgenote—The Smith Street Bridge by Mayor Blackman

Recent Posts

🍂 Fall Leaf Pickup Notice 🍂

Fall leaf collection is underway! Please take note of the following guidelines: Schedule: Collection runs through December 11th (or until the first major snowfall). Placement: Place leaves at the curb, not in the street or road. If Using Bags: Only biodegradable paper...

Village Board Meeting 10/19/2026

The agenda and packet for the Village Board Meeting of 10/19/2026 can be seen here https://ecode360.com/BR0227/document/753296999.pdf

Village Office closed

BROCKPORT VILLAGE HALL is closed Monday, October 12, 2026 In Honor of Indigenous Peoples’ Day   Feel free to place correspondence or payments in the locked drop box at drive entrance. Thank you.

At a special meeting of the Village Board, January 10th, Fisher Associates presented their plans for the pedestrian and cyclist upgrades to the bridge, the wall repairs, and the sidewalks.  Complete information will be in the minutes from the meeting when they are posted.

Importantly, the bridge will continue to have stoplights, upgraded to video detection stoplights, which are triggered by a car or bicycle, eliminating the current programmed waiting.  A  5’ wide diamond plate steel strip (shown on right side of lane in the photo) will run down the center of the bridge for bicycles.