Fall leaf collection is underway! Please take note of the following guidelines: Schedule: Collection runs through December 11th (or until the first major snowfall). Placement: Place leaves at the curb, not in the street or road. If Using Bags: Only biodegradable paper...
PARKSIDE UTILITY CONSTRUCTION, LLC. IS WORKING IN THE VILLAGE ON BEHALF OF FRONTIER COMMUNICATIONS
Recent Posts
Village Board 11/02/2026 DRAFT agenda and packet
To view the DRAFT agenda and packet for the 11/02/2026 Village Board meeting, follow this link: https://ecode360.com/BR0227/document/753297364.pdf
10/26/2026 DRAFT Village Board Workshop
To view the DRAFT agenda for the 10/26/2026 Village Board Workshop, follow this link: https://ecode360.com/BR0227/document/753297271.pdf
Village Board Meeting 10/19/2026
The agenda and packet for the Village Board Meeting of 10/19/2026 can be seen here https://ecode360.com/BR0227/document/753296999.pdf
Village Office closed
BROCKPORT VILLAGE HALL is closed Monday, October 12, 2026 In Honor of Indigenous Peoples’ Day Feel free to place correspondence or payments in the locked drop box at drive entrance. Thank you.
Hydrant Flushing – October 6th – 8th 2026
To see the full notice click here: Fall Flushing Notice October 2026
Parkside will be placing telephone cable, upgrading to fiber optic line, on existing poles, in the right of way throughout the Village.
The aerial work will continue for at least another week.
If you have any questions or concerns, please feel free to call the Concern Line at 888-512-3537.
**Parkside will also install buried lines in the right of way, we do not have the timeline for installation at this time. **
